|
Commercial Shopping Center, Palm Springs, CA |
|
Page 3 of 3

| May 2001 - GJ Murphy's Construction The roof ledger was bolted directly to the Tridipanel system after concrete was applied. The ledger can be applied before or after concrete application. | 
| 
A skilsaw using diamond edge masonry blade is used to easily cut doors and windows in panels. | 
Standing an 18' high panel on commercial building, Palm Springs, California, February 2001 Panels are very easy to stand. No heavy equipment is required. | 
Twenty-foot high walls, the worker in the high lift is fastening the flat mesh which ties the panels together. | 
| 
|

Finished Commercial Shopping Center |
|