Horse Barn
Article Index
Horse Barn
Page 2
Page 3
Page 4

Image
When installing the 3-d panel roof panels, the panel is lifted over the wire mesh angles and fastened in place from the under side. Another wire mesh angle is fastened to the top side of the 3-d panel.
Image
Bond beams are created when a re-bar is installed over large openings to reinforce the concrete walls. This can be done by removing the foam core and installing re-bar.
Image
Shoring is required on the underside of the ceilings. I recommend spacing the shoring every four feet under the roof panels.
Image
Wiring can be placed behind the wire mesh and should be incased in flex tubing or conduit.



< Prev   Next >
©2001-2008 Hadrian Tridi-Systems. All rights reserved. The content of this site, including text and images, belongs to Hadrian Tridi-Systems and we will protect it vigorously. These contents are protected by the copyright laws of the United States of America. No portion of this Web site may be reproduced in any form, or by any means, without the written consent of Hadrian Tridi-Systems. You will be prosecuted to the full extent of the law and you will be reported to your Internet Service Provider, your hosting company, and law enforcement agencies if you steal text and images from this website. By permission, this site may use or refer to third-party trademarks or servicemarks which remain the property of their respective owners.

Copyright 2008 © - Hadrian Tridipanel Systems