Home arrow Projects arrow Sound Walls arrow Photo Series 3 — Extended Stay of America, San Jose, CA
Photo Series 3 — Extended Stay of America, San Jose, CA

Sound Walls

Image

Installing Panels

This wall was built on an old land fill.

Cassions were placed 10' on center, 2' x 9' deep. The rebar was brought up into a 12" x 12" column between the 10' long Tridipanels.

Image

Note the pnuematic wire fastening tool.

This tool allows the panels to be fastened very rapidly. Another name for the tool is a 'hog ringer'. It fastens a small round ring around the wires on the panels.

 

Image

Flat mesh is installed with a pneumatic wire fastening tool.

< Prev   Next >
©2001-2008 Hadrian Tridi-Systems. All rights reserved. The content of this site, including text and images, belongs to Hadrian Tridi-Systems and we will protect it vigorously. These contents are protected by the copyright laws of the United States of America. No portion of this Web site may be reproduced in any form, or by any means, without the written consent of Hadrian Tridi-Systems. You will be prosecuted to the full extent of the law and you will be reported to your Internet Service Provider, your hosting company, and law enforcement agencies if you steal text and images from this website. By permission, this site may use or refer to third-party trademarks or servicemarks which remain the property of their respective owners.

Copyright 2008 © - Hadrian Tridipanel Systems