| Suzy Brown |
Page 6 of 9
Scaffold has been installed, and a bond beam has been made ready at the roof line for the ceiling joist.
Window and door opening have been marked out also scaffolding installed, please do not over look the need for proper scaffold. |
|||||||||||
| < Prev | Next > |
|---|

