Page 3 of 9
Johnny the lead 3-d panel installer spraying a wet cement mortar mix with 2500 psi or more with three and a half parts sand and one part Portland cement to the lower section of exterior side, he will spray tightly to the bottom of form to prevent cement from leaking from the bottom side of the form.
3-D panel system with a wooden truss system connected to the bond beam. (Note). Floors and roof truss are complete by using the same method, the roof trusses will be connected the same way.
Bill Hadrian and crew at the sand pile.
A photo of a small mortar mix panel pump. The Portland cement will be brought to this pump by a wheel barrow. |
|||||||||||