| Suzy Brown |
Page 5 of 9
Floor trusses installed, after sheeting is installed the door and window opening will be cut into the 3-d panel walls.
Installing the floor sheeting.
The nozzle man applying Portland cement mortar mix to a portion of the 3-d panel wall system below grade.
Portland cement on the stem wall completed. |
|||||||||||
| < Prev | Next > |
|---|


