| Denny Segler |
Page 2 of 4
The rear view of the Tridipanel home.
The complete roof load and wood truss system setting on the Tridipanel wall system, before Portland cement mortar has been applied.
The electrical I run in conduit or plastic flex, this electrical box has been set in place, the cement will keep it from moving.
The plumbing is also set behind the wire mesh, I recommend covering all copper pipe with some type of protective cover such as shown here prior to spraying Portland cement or shotcrete. |
||||||
| < Prev | Next > |
|---|


