Greg Gran
Article Index
Greg Gran
Page 2
Page 3

Image

3-D panel wall system caring a complete roof load and also floor joist, prior to having shotcrete applied. I have been showing this photo to many of our engineering firms whom over engineer our product. The nine gauge wires welded from mesh to mesh twelve studs per 3-d panel are stronger than wood studs.

Image

Rear view of Greg’s home and temporary scaffolding.

Image

Side view of 3-D panel system.

Image

The truss roof system being carried by the 3-D panel wall system before shotcrete has been applied to the walls.

 



< Prev   Next >
©2001-2008 Hadrian Tridi-Systems. All rights reserved. The content of this site, including text and images, belongs to Hadrian Tridi-Systems and we will protect it vigorously. These contents are protected by the copyright laws of the United States of America. No portion of this Web site may be reproduced in any form, or by any means, without the written consent of Hadrian Tridi-Systems. You will be prosecuted to the full extent of the law and you will be reported to your Internet Service Provider, your hosting company, and law enforcement agencies if you steal text and images from this website. By permission, this site may use or refer to third-party trademarks or servicemarks which remain the property of their respective owners.

Copyright 2008 © - Hadrian Tridipanel Systems