Finished project, note the concrete counter top out door wash basin Denny built on the end of the 3-D panel home.
Roof tiles can be scribed into Portland cement very easily, please take into consideration the time frame the structure was built three weeks from start to finish with workers or installers whom had never worked with this product, this show’s why this 3-d panel system is such a superior product, it’s simplify to build unbelievable strong structure quickly with the every day resources available in most countries of the world.
These are some of the tools that were used to install the panels on this home in Sri Lanka.
|
|||||||