Sri Lanka
Article Index
Sri Lanka
Page 2
Page 3
Page 4
Page 5

Image

Finished project, note the concrete counter top out door wash basin Denny built on the end of the 3-D panel home.

Image

Roof tiles can be scribed into Portland cement very easily, please take into consideration the time frame the structure was built three weeks from start to finish with workers or installers whom had never worked with this product, this show’s why this 3-d panel system is such a superior product, it’s simplify to build unbelievable strong structure quickly with the every day resources available in most countries of the world.

Image

These are some of the tools that were used to install the panels on this home in Sri Lanka.

 



< Prev
©2001-2008 Hadrian Tridi-Systems. All rights reserved. The content of this site, including text and images, belongs to Hadrian Tridi-Systems and we will protect it vigorously. These contents are protected by the copyright laws of the United States of America. No portion of this Web site may be reproduced in any form, or by any means, without the written consent of Hadrian Tridi-Systems. You will be prosecuted to the full extent of the law and you will be reported to your Internet Service Provider, your hosting company, and law enforcement agencies if you steal text and images from this website. By permission, this site may use or refer to third-party trademarks or servicemarks which remain the property of their respective owners.

Copyright 2008 © - Hadrian Tridipanel Systems