| Dubai |
Page 3 of 3
3-D panel wall to floor connection, the void will be filled with concrete; rebar will be installed to receive the upper lever of 3-D panel walls. 3-D panel construction, forms have been placed, shoring has been placed under the 3-D panel floors, concrete will be poured on top of the 3-D panel floors, the rebar standing straight up will receive the next level of panels.
3-D panel construction a view of the shoring under the 3-D panel floor or roof system.
3-D panel wall system, a close view of floor to wall bond beam. |
|||||
| < Prev | Next > |
|---|


