Waianae Project
Waianae Project: Getting ready to start project.
 
Image
 
Insteel 3-dpanel being readied to erect. The foam is being removed from the end so the rebar will fit into the panel.
 
Image
 
Insteel 3-dpanel being installed, the foam has been removed prior to standing, the floor will connect at this point, we will create a concrete bond beam.
 
Image
 
Insteel 3-dpanel, wire is used to help raise the panels, this being the gable end the panels were twenty feet long.
 
Image
 
Insteel 3-dpanels applying the flat mesh, this connects the panels together, this is used on both sides of the panels.
 
Image
 
Insteel 3-dpanel, installing the gable end with panel over rebar.
 
Image
 
Insteel 3-dpanels, burning the foam to allow concrete to flow around the rebar tie down. Note: the hog ring tool to the right of the man burning foam, this tool is used to fasten panels together.
 
Image
 
Insteel 3-dpanels, the home is now coming together.
 
Image
 
Insteel 3-dpanels, installing panels over garage door opening!
 
Image
 
Next >
©2001-2008 Hadrian Tridi-Systems. All rights reserved. The content of this site, including text and images, belongs to Hadrian Tridi-Systems and we will protect it vigorously. These contents are protected by the copyright laws of the United States of America. No portion of this Web site may be reproduced in any form, or by any means, without the written consent of Hadrian Tridi-Systems. You will be prosecuted to the full extent of the law and you will be reported to your Internet Service Provider, your hosting company, and law enforcement agencies if you steal text and images from this website. By permission, this site may use or refer to third-party trademarks or servicemarks which remain the property of their respective owners.

Copyright 2008 © - Hadrian Tridipanel Systems