Waianae Project: Getting ready to start project.
Insteel 3-dpanel being readied to erect. The foam is being removed from the end so the rebar will fit into the panel.
Insteel 3-dpanel being installed, the foam has been removed prior to standing, the floor will connect at this point, we will create a concrete bond beam.
Insteel 3-dpanel, wire is used to help raise the panels, this being the gable end the panels were twenty feet long.
Insteel 3-dpanels applying the flat mesh, this connects the panels together, this is used on both sides of the panels.
Insteel 3-dpanel, installing the gable end with panel over rebar.
Insteel 3-dpanels, burning the foam to allow concrete to flow around the rebar tie down. Note: the hog ring tool to the right of the man burning foam, this tool is used to fasten panels together.
Insteel 3-dpanels, the home is now coming together.
Insteel 3-dpanels, installing panels over garage door opening!
|