Egypt Photos

Professor Ayman S. Mosallam, PH.D. PE University of California, Irvine, Ca. requested my assistant to supervise and the construction of a model home in Cairo, Egypt.

The Housing and Building National Research Center of Egypt was responsible for building several model homes of different “green” building products. The model home that I have supervised is a product of a separate company that I am involve with called ”EnBuil Ltd.” and I acted as the construction director for that company. I was present on the project Dec. 29, 2009 thru Jan. 16, 2010.
Enbuil is looking for partners to joint venture in projects worldwide. Please contact myself if you have such interest at email panel@tridipanel.com.

The Housing and building National Research Center of Egypt, headed by H.E. Prof. M. El Demirdasm is the owner of this project. The photos that follow show the different players of this national project, including the HBRC Chair and many counterparts which wish to improved the quality of building and living in Egypt and the World. Although the project was not complete when I left I do hope you enjoy the photos and text, I will try to complete with additional photos as a later date.


Re-bar installation, cleaning holes for epoxy to install rebar.

Mixing Sika epoxy for the rebar installing.

The crew installing rebar.

Professor Mosallam and Rod Hadrian at a seafood restaurant in Cairo, Egypt.

Rod Hadrian in from of Safir Hotel in Cairo, this hotel was excellent.

Standing in the first panel, all panels were furnished by the Chinese Manufacturing Co.

Goo Building a beam with the panels.

The crew standing panels.

Panels and scaffolding.

The second floor forms being placed around the perimeter prior to concrete being pour.

The right side of the first floor with panels and scaffolding.

Rod Hadrian on his day off enjoying the tour of the Pyramids.

Rod Hadrian in Egypt with the H.B.R.C. Housing and Building National Research Center.

A temporary window jam, it will be removed after shotcrete, and a metal jam installed.
 

Installing roof panels.

Installing roof panels.

Electrical work and door jams.

The door jam prior to being installed, the jams are the exact width when the concrete is finish off the edge of the jam.

Story pole, you can see the panels marked on the top of the pole this is used to place and angles at the right elevation.

Goo installing wire mesh angles around the perimeter of the room prior to the roof panels being installed.

The night shift installing the flat mesh on the ceiling panels.

Crewman Goo cutting the panel.

Installing electrical pvc piping.

Preparing the floor of the 2nd floor for the concrete pour.

Professor Mosallam and Dr. Mostafa El Demerdasm both of H.B.R.C. discussing the project.

Rod Hadrian, Professor Mosallam and Dr. Mostafa and others members of the H.B.R.C.

Green building, Dr. Mostafa El Demeidasm in front of the recycle bins.

Working on the 2nd floor.

Plumbing installed behind the wire mesh.

Shoring installed prior to the concrete being pour above.

Door jams set in hallway.

Door jam and electric box, the cement helps hold the door jam in place.

The door jam is install into the panel wall.

Straight edge across two door jams, it is important to line up the jams.

Portland cement being mixed by hand.

Screening sand and cement.

Installing the scaffolding.

Blowing concrete from the hole so it is dust free for epoxy.