
Re-bar installation, cleaning holes for epoxy to install rebar.
|

Mixing Sika epoxy for the rebar installing.
|

The crew installing rebar.
|

Professor Mosallam and Rod Hadrian at a seafood restaurant in Cairo, Egypt.
|

Rod Hadrian in from of Safir Hotel in Cairo, this hotel was excellent.
|

Standing in the first panel, all panels were furnished by the Chinese Manufacturing Co.
|

Goo Building a beam with the panels.
|

The crew standing panels.
|

Panels and scaffolding.
|

The second floor forms being placed around the perimeter prior to concrete being pour. |

The right side of the first floor with panels and scaffolding.
|

Rod Hadrian on his day off enjoying the tour of the Pyramids.
|

Rod Hadrian in Egypt with the H.B.R.C. Housing and Building National Research Center.
|

A temporary window jam, it will be removed after shotcrete, and a metal jam installed.
|
|

Installing roof panels.
|

Installing roof panels.
|

Electrical work and door jams. |

The door jam prior to being installed, the jams are the exact width when the concrete is finish off the edge of the jam.
|

Story pole, you can see the panels marked on the top of the pole this is used to place and angles at the right elevation.
|

Goo installing wire mesh angles around the perimeter of the room prior to the roof panels being installed.
|

The night shift installing the flat mesh on the ceiling panels.
|

Crewman Goo cutting the panel.
|

Installing electrical pvc piping.
|

Preparing the floor of the 2nd floor for the concrete pour.
|

Professor Mosallam and Dr. Mostafa El Demerdasm both of H.B.R.C. discussing the project.
|

Rod Hadrian, Professor Mosallam and Dr. Mostafa and others members of the H.B.R.C.
|

Green building, Dr. Mostafa El Demeidasm in front of the recycle bins.
|

Working on the 2nd floor.
|

Plumbing installed behind the wire mesh.
|

Shoring installed prior to the concrete being pour above.
|

Door jams set in hallway.
|

Door jam and electric box, the cement helps hold the door jam in place.
|

The door jam is install into the panel wall.
|

Straight edge across two door jams, it is important to line up the jams.
|

Portland cement being mixed by hand.
|

Screening sand and cement.
|

Installing the scaffolding. |

Blowing concrete from the hole so it is dust free for epoxy. |